EMC carried out roof rehabilitation and waterproofing works at a hotel in Giza, including removal of deteriorated waterproofing layers, joint repairs, application of Tray Seal 307 cementitious waterproofing, and a final acrylic protective coating.
EMC Integrated Contracting carried out roof rehabilitation and waterproofing works at a hotel in Giza Governorate, Egypt, aiming to address deteriorated waterproofing layers and improve protection against water and moisture penetration.
The works included removing damaged cementitious layers and old waterproofing materials, followed by surface grinding, cleaning, and preparation. Gaps and joints were treated using foam fillers, epoxy putty, and fiber-reinforced protective treatments at critical junctions.
Two perpendicular coats of Tray Seal 307 cementitious waterproofing were then applied, followed by a final acrylic coating to provide additional protection against UV exposure and weather conditions.
Removal of deteriorated cementitious layers and existing waterproofing materials.
Surface grinding and thorough cleaning.
Surface preparation and dampening before waterproofing.
Filling of gaps and joints using foam inserts.
Treatment of edges and junctions with epoxy putty.
Fiber-reinforced treatment of critical junctions.
Application of two perpendicular coats of Tray Seal 307 cementitious waterproofing.
Application of a final UV-resistant acrylic protective coating.
Final finishing and completion of the waterproofing works.