Construction & Building Sector Cementitious Waterproofing System

Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza

Giza, Giza Governorate, Egypt
19 Jan 2025
Hospitality and Tourism – Hotel Facility

EMC carried out roof rehabilitation and waterproofing works at a hotel in Giza, including removal of deteriorated waterproofing layers, joint repairs, application of Tray Seal 307 cementitious waterproofing, and a final acrylic protective coating.

Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 1
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 2
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 3
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 4
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 5
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 6
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 7
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 8
Hotel Roof Rehabilitation with Cementitious Waterproofing and Acrylic Protection – Giza 9
1 / 9

Hotel Roof Waterproofing and Rehabilitation in Giza

EMC Integrated Contracting carried out roof rehabilitation and waterproofing works at a hotel in Giza Governorate, Egypt, aiming to address deteriorated waterproofing layers and improve protection against water and moisture penetration.

The works included removing damaged cementitious layers and old waterproofing materials, followed by surface grinding, cleaning, and preparation. Gaps and joints were treated using foam fillers, epoxy putty, and fiber-reinforced protective treatments at critical junctions.

Two perpendicular coats of Tray Seal 307 cementitious waterproofing were then applied, followed by a final acrylic coating to provide additional protection against UV exposure and weather conditions.


Scope of Work

  • Removal of deteriorated cementitious layers and existing waterproofing materials.

  • Surface grinding and thorough cleaning.

  • Surface preparation and dampening before waterproofing.

  • Filling of gaps and joints using foam inserts.

  • Treatment of edges and junctions with epoxy putty.

  • Fiber-reinforced treatment of critical junctions.

  • Application of two perpendicular coats of Tray Seal 307 cementitious waterproofing.

  • Application of a final UV-resistant acrylic protective coating.

  • Final finishing and completion of the waterproofing works.

Case Study

The Challenge

The hotel roof had deteriorated waterproofing layers, damaged cementitious surfaces, gaps, and vulnerable joints, creating potential pathways for water penetration and requiring extensive preparation before installing a new waterproofing system.

The Solution

Damaged layers were removed, and the roof was ground, cleaned, and prepared. Gaps and junctions were treated using foam fillers, epoxy putty, and fiber reinforcement, followed by two perpendicular coats of Tray Seal 307 and a final acrylic protective coating.

The Result

The hotel roof was rehabilitated with a cementitious waterproofing system, reinforced treatments at vulnerable joints, and a final acrylic protective coating designed to improve resistance to water penetration and weather exposure.