01559192562 01030503551 01555441359 0572060545 info@emcegy.net 315/34 13 ST, Abu Al-Kheir, New Damietta, Egypt
Poultry Farms Sector Polyurethane Foam System

Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm

Gamasa, Dakahlia Governorate, Egypt.
16 Dec 2024
Al Baraka Poultry

Across 740 m², EMC carried out thermal and waterproof insulation works on the external walls of Al Baraka Poultry Farm in Gamasa, using polyurethane spray foam with a specified thickness of 30 mm ± 5 mm, followed by two acrylic protective coats.

Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 1
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 2
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 3
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 4
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 5
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 6
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 7
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 8
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 9
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 10
Poultry Farm Wall Insulation Project – Al Baraka Poultry Farm 11
1 / 11

Polyurethane Foam Insulation for Al Baraka Poultry Farm Walls

EMC Integrated Contracting carried out thermal and waterproof insulation works on the external walls of Al Baraka Poultry Farm in Gamasa, Dakahlia Governorate, Egypt, covering a total area of 740 m².

The project aimed to reduce heat transfer through the building walls while improving their protection against moisture and weather exposure.

The works included preparing the external wall surfaces and applying polyurethane spray foam to create a continuous insulation layer. The foam thickness was checked during application against the specified 30 mm ± 5 mm requirement.

Two coats of acrylic protective coating were then applied over the foam to help protect it against ultraviolet radiation and weather conditions, followed by final inspection and handover.


Scope of Work

  • Inspection and preparation of external wall surfaces.

  • Surface cleaning before insulation application.

  • Preparation of polyurethane foam spraying equipment.

  • Application of polyurethane spray foam to external walls.

  • Formation of a continuous thermal and waterproof insulation layer.

  • Application of foam to the specified thickness of 30 mm ± 5 mm.

  • Foam thickness measurement using appropriate inspection tools.

  • Application of the first acrylic protective coat.

  • Application of the second acrylic coat for complete coverage.

  • UV and weather protection of the polyurethane foam layer.

  • Final inspection and handover of the insulated walls.

Case Study

The Challenge

The project required effective thermal and waterproof insulation for the poultry farm's external walls to reduce heat transfer and improve protection against moisture and weather exposure, while maintaining a uniform insulation layer suitable for the facility's operating environment.

The Solution

Polyurethane spray foam was applied to the external walls to form a continuous thermal and waterproof insulation layer. The specified thickness of 30 mm ± 5 mm was checked using appropriate measurement tools, followed by two acrylic coats for UV and weather protection.

The Result

A combined thermal and waterproof insulation system was installed across 740 m² of external walls, helping reduce heat transfer and improve protection against moisture and weather exposure, with two acrylic coats protecting the foam insulation.

Project Videos

Polyurethane Foam Insulation for Poultry Farm Walls

Call WhatsApp Quote